Viewing Tender: #273
Print Tender
Tender Title: Extension to the Dunbrody Visitor Centre Location: New Ross, Wexford
Date Published: 30-Jul-2010 11:40 Deadline for Tenders: 20-08-2010 Approx Start Date Required: 14-09-2010
Tender Status:

Closed - Tender has expired. Applications are no longer being accepted.

Development
Type:
Commercial: Repair & Maint. / Installation / Extension Category: Building Contractors (Sml / Med Scale)
Files Attached: Doc 1 of 7 Suitability Assessment Questionnaire QW2 Works Contractor.doc   (Suitability Assessment Questionnaire QW2 Works Contractor)
Doc 2 of 7 SUPPLEMENT 3.4.1 Suitability Questionnaire Works Contractor.doc   (SUPPLEMENT 3.4.1 Suitability Questionnaire Works Contractor)
Doc 3 of 7 SUPPLEMENT 3.4.2 Suitability Questionnaire Works Contractor.doc   (SUPPLEMENT 3.4.2 Suitability Questionnaire Works Contractor)
Doc 4 of 7 APPENDIX A. Suitability Questionnaire Works Contractor.doc   (APPENDIX A. Suitability Questionnaire Works Contractor)
Doc 5 of 7 APPENDIX B1. Suitability Questionnaire Works Contractor.doc   (APPENDIX B1. Suitability Questionnaire Works Contractor)
Doc 6 of 7 APPENDIX B2 Suitability Questionnaire Works Contractor.doc   (APPENDIX B2 Suitability Questionnaire Works Contractor)
Doc 7 of 7 APPENDIX C2. Suitability Questionnaire Works Contractor.doc   (APPENDIX C2. Suitability Questionnaire Works Contractor)
Doc 1 of 8 QW3 SPECIALIST Suitability Assmt Questionnaire Mechanical and Electrical.doc   (QW3 SPECIALIST Suitability Assmt Questionnaire Mechanical and Electrical)
Doc 2 of 8 QW3 SPECIALIST SUPPLEMENT 3.4.1 Mechanical and Electrical.doc   (QW3 SPECIALIST SUPPLEMENT 3.4.1 Mechanical and Electrical)
Doc 3 of 8 QW3 SPECIALIST SUPPLEMENT 3.4.2 Mechanical and Electrical.doc   (QW3 SPECIALIST SUPPLEMENT 3.4.2 Mechanical and Electrical)
Doc 4 of 8 QW3 SPECIALIST APPENDIX A. Mechanical and Electrical.doc   (QW3 SPECIALIST APPENDIX A. Mechanical and Electrical)
Doc 5 of 8 QW3 SPECIALIST APPENDIX B1 Mechanical and Electrical.doc   (QW3 SPECIALIST APPENDIX B1 Mechanical and Electrical)
Doc 6 of 8 QW3 SPECIALIST APPENDIX B2 Mechanical and Electrical.doc   (QW3 SPECIALIST APPENDIX B2 Mechanical and Electrical)
Doc 7 of 8 QW3 SPECIALIST APPENDIX C1.Mechanical and Electrical.doc   (QW3 SPECIALIST APPENDIX C1.Mechanical and Electrical)
Doc 8 of 8 QW3 SPECIALIST APPENDIX C2 Mechanical and Electrical.doc   (QW3 SPECIALIST APPENDIX C2 Mechanical and Electrical)
Doc 1 of 8 QW3 SPECIALIST Suitability Assmt Questionnaire Curtain Walling.doc   (QW3 SPECIALIST Suitability Assmt Questionnaire Curtain Walling)
Doc 2 of 8 QW3 SPECIALIST SUPPLEMENT 3.4.1 Curtain Walling.doc   (QW3 SPECIALIST SUPPLEMENT 3.4.1 Curtain Walling)
Doc 3 of 8 QW3 SPECIALIST SUPPLEMENT 3.4.2 Curtain Walling.doc   (QW3 SPECIALIST SUPPLEMENT 3.4.2 Curtain Walling)
Doc 4 of 8 QW3 SPECIALIST APPENDIX A. Curtain Walling.doc   (QW3 SPECIALIST APPENDIX A. Curtain Walling)
Doc 5 of 8 QW3 SPECIALIST APPENDIX B1 Curtain Walling.doc   (QW3 SPECIALIST APPENDIX B1 Curtain Walling)
Doc 6 of 8 QW3 SPECIALIST APPENDIX B2 Curtain Walling.doc   (QW3 SPECIALIST APPENDIX B2 Curtain Walling)
Doc 7 of 8 QW3 SPECIALIST APPENDIX C1.Curtain Walling.doc   (QW3 SPECIALIST APPENDIX C1.Curtain Walling)
Doc 8 of 8 QW3 SPECIALIST APPENDIX C2 Curtain Walling.doc   (QW3 SPECIALIST APPENDIX C2 Curtain Walling)
Doc 1 of 8 QW3 SPECIALIST 3 Suitability Assmt Questionnaire Piling Works.doc   (QW3 SPECIALIST 3 Suitability Assmt Questionnaire Piling Works)
Doc 2 of 8 QW3 SPECIALIST SUPPLEMENT 3.4.1 Piling Works.doc   (QW3 SPECIALIST SUPPLEMENT 3.4.1 Piling Works)
Doc 3 of 8 QW3 SPECIALIST SUPPLEMENT 3.4.2 Piling Works.doc   (QW3 SPECIALIST SUPPLEMENT 3.4.2 Piling Works)
Doc 4 of 8 QW3 SPECIALIST APPENDIX A. Piling Works.doc   (QW3 SPECIALIST APPENDIX A. Piling Works)
Doc 5 of 8 QW3 SPECIALIST APPENDIX B1 Piling Works.doc   (QW3 SPECIALIST APPENDIX B1 Piling Works)
Doc 6 of 8 QW3 SPECIALIST APPENDIX B2 Piling Works.doc   (QW3 SPECIALIST APPENDIX B2 Piling Works)
Doc 7 of 8 QW3 SPECIALIST APPENDIX C1.Piling Works.doc   (QW3 SPECIALIST APPENDIX C1.Piling Works)
Doc 8 of 8 QW3 SPECIALIST APPENDIX C2 Piling Works.doc   (QW3 SPECIALIST APPENDIX C2 Piling Works)
Full Tender Text:
The existing Dunbrody Visitor Centre on the South Quays in New Ross will be extended by raising and altering the existing building and adding a first floor and constructing a new 2 storey extension which will extend out over the River Barrow. The works are scheduled to commence in early September and be completed within a 24 week period. Contractors are required to submit a completed Suitability Assessment Questionnaire with their tender.

The work will entail alterations and a 2 storey extension to the Dunbrody Visitor Centre in New Ross. The total floor area is approximately 950 square metres.

This is an open tender procedure. Time-limit for requests to participate 09/08/2010 Time 12:00. Tender Documents are available from Malone O’Regan Consulting Engineers, St. Catherines House, Catherine Street, Waterford. All enquiries should be addressed for the attention of J Norris. Email address is jnorris@waterford.morce.ie, phone (051) 876855 or fax (051) 876828.

Tenders must be sent to Sean Reidy, John F Kennedy Trust, South Quay, New Ross and clearly marked Ref:Extension to the Dunbrody Visitor Centre tender #273.

All applicants should have previous experience in (completed) similar type projects in the last 5 years. Annual minimum turnover of €1.5 million for the previous 3 years of accounts (i.e. €1.5 million for each of the previous 3 years).

Evidence of turnover, public and employer liability insurance and capacity to obtain a performance bond all as stated in the attached suitability assessment questionnaire.

Additional Information
The candidate must pass the Suitability Assessment Questionnaire for the Main Contractor on the basis of the information submitted in response to that Questionnaire.

The contract will be awarded on the basis of the most economically advantageous tender. The assessment of the most economically advantageous tender will be made on the basis of the award criteria provided in the Particulars attached to the Instructions to Tenderers.

The successful applicant will be appointed Works Contractor and Project Supervisor for the Construction Stage (PSCS) on the project in accordance with the Safety, Health and Welfare at Work (Construction) Regulations.

It is a condition precedent to the award of the contract that the successful tenderer will provide.

1. A current tax clearance certificate or in the case of a non-resident contractor a statement of suitability on tax grounds from the Revenue Commissioners of Ireland.
2. Evidence showing that they are in compliance with the Registered Employment Agreement (Construction Industry Pensions Assurance and Sick Pay).
(ET Ref: 132414)



Further Details:
What supporting documentation is available? site/building plans, bill of quantities.Full specification drawings for the extension works available from Malone ORegan Consulting Engineers, St. Catherines House, Catherine Street, Waterford. All enquiries should be addressed for the attention of J Norris. Email address is jnorris@waterford.morce.ie, phone (051) 876855 or fax (051) 876828

Full suitability assessment questionnaires in the areas of works contractor, Mechanical and Electrical, Curtain Walling and Piling Works are attached to this tender.

Share |

You need to Sign Up or Log In before you can apply for Tenders.